Post from February, 2010

The OCM Challenge of IT / Part 1

Tuesday, 2. February 2010 20:02

Part 1 is aimed,

  • To review briefly the conditions where software systems were built at 80′s.
  • To emphasize the persistence of failures in today’s IT projects. 

This is the preamble (stressing the software development crashes at that times because of IT project’s mismanagement) to introduce my central discussion in the subsequent deliveries: the relationship between OCM, IT and PM.

Click > A Short Archaeology of IT Failures

Post to Twitter

Send article as PDF to PDF Download

Category:BPR, IT | Comment (0) | Author: Luis F Pacheco

Tweeter button Facebook button Technorati button Linkedin button Webonews button Stumbleupon button Newsvine button Youtube button